Door and window glass installation and acceptance points

[China Glass Net] First, the door and window glass installation 1. The door and window frame, the fan has been installed and adjusted, and the filling between the frame and the wall has been completed.

2. Frames, fans, etc. meet the requirements of design drawings and assembly drawings.

3. The temperature at the time of installation must be within the temperature range required by the manufacturer.

4. The glass slot should be cleaned and free of obstacles.

5. The glass tank should be drained smoothly.

6. The glass has been cut as required and shipped in place.

7. The surface of the glass is free of water, dust, grease, oil or other harmful substances and should be wiped clean.

8. Scaffolding and other requirements have been met.

Second, the door and window glass installation points

1. Do not let the glass hit the frame during installation to avoid broken glass edges.

2. Glass that has severe flaking or roughened edges due to breakage cannot be used.

3. If the bottom edge of the glass has a beveled or horned edge near the block, turn this edge to the top.

4. The block should be placed according to the requirements of the drawings and must not be moved, as shown below.

5. Do not weld, sandblast or pickle near the glass, otherwise it will affect the strength and appearance of the glass. If it is necessary, the glass can be protected with canvas or wood-based materials, and the glass should be rinsed with water immediately after pickling.

6. If paint, concrete, plaster, plaster or other similar materials adhere to the surface of the glass, immediately wash it with water or a corresponding solvent, otherwise it will have an erosive effect on the glass surface. 7. Do not scratch the coating with a hard object. The membrane side of the glass.

8. Note that the gap between the glass and the metal window frame should meet the requirements of the right and the following table.

Third, the door and window glass installation completed acceptance 1. The construction party should provide design documents, design modification documents and material substitution documents.

2. Provide the factory certificate of thick glass and the certificate of processing glass.

3. Provide self-inspection records for construction installation.

4. Provide a quality guarantee for physical durability years under normal conditions.

5. The appearance of glass is subject to the national standard.

6. The installation direction of the glass should be correct, and the side of the coated glass should be facing indoors.

7. The glass should be installed firmly, and the rubber strip and sealant should be inlaid and filled flat.

8. The quality of appearance should be thoroughly checked during the inspection. The quality of the project is mainly based on sampling inspection, and the sampling number is 5%, but not less than 3樘.

Basic Fabric For Car's Inner